Goxhill pipeline project

Digging deep in Goxhill

How we handled 200,000 tonnes of excavated tunnel material.

Our project involved the construction of a tunnel approximately five kilometres in length and four metres in diameter. The tunneling process produced some 200,000 tonnes of material (known as “arisings”), that had to be taken off site.