During the construction process of 5km tunnel under the Humber estuary Allied Plant provided transport and hire of plant that played a key role in the tunnel arisings removal.
The service was reliable and professional, machine operators and HGV drivers were consistently receiving nothing but praises from the local residents for being considerate.
Their modern fleet was equipped with the latest safety technology allowing to maintain the highest safety standards on and off site.
It was a pleasure to work with Allied team. – 27/08/20